Showing posts with label ktm. Show all posts
Showing posts with label ktm. Show all posts

Saturday, April 07, 2007

Of fast cars and slow trains

Pix source: Formula One at Sepang (top) courtesy of Malaysia's Shukor Janis of Shuk Photo, and KTM (bottom) from Wikipedia

The race is on for Singapore to narrow the gap with Malaysia in the Formula One arena. Singapore is set to sign a deal to host F1 in a couple of weeks -- some eight years after Malaysia joined the F1 circuit.

Many people, including some commentators in Singapore, had criticised former Malaysian Prime Minister Dr Mahathir Mohamad's decision to build a first-class track in the middle of the jungle. The Sepang track was conveniently billed as one of his wasteful mega projects.

But many people have come around to accept the wisdom of hosting the F1 event as a necessary tourist magnet.

Unlike many competitive areas between the two countries due to their proximity, there is room to host the big event in the two nearby capitals. As pointed out by Dr Mahathir's second son Mokhzani Mahathir in The Straits Times today, the races in Malaysia must not be held back to back. Mokhzani, who was instrumental in bringing F1 to Malaysia together with his father, said the races in Singapore and Malaysia must be held at different ends of the eight-month racing calendar. Malaysia at the start and Singapore at the end, he said.

Sounds reasonable to make it more appealing to fans who won't want to be under the equatorial sun for two straight races. And there two other key aspects to differentiate the two racing venues -- Singapore is likely to have street racing versus a closed circuit in Malaysia; and night racing in Singapore versus day racing in Sepang.

While the two countries are likely to see cars going at more than 300 km an hour outside Kuala Lumpur and in Singapore, we will have to wait for some time before we can see a fast train zipping from Singapore to KL at over 300 km. The two governments are still studying the proposal by
YTL to build a bullet train from KL to Singapore, cutting travel time to just 90 minutes from the current 8-hour snail ride provided by Keretapi Tanah Melayu (KTM).

According to Malaysia's
The Business Times today, German engineering expert Siemens is keen to be the technology provider for the proposed high-speed train project linking the capitals of Malaysia and Singapore.

Tim Hunter, Siemens' new head of rail for Malaysia, painted an interesting route the proposed train service could take.

"Ideally, it would begin from KL Sentral, linking the airport and Johor Baru and Changi Airport - that would make sense to me because inter-modal exchanges are most important."

What a great route! One can hop from one airport to another in 90 minutes or so.

But he also noted a complication. He said the existing KTM routes would have to be upgraded significantly, as would the causeway crossing. The existing causeway linking JB and Singapore could well be the deciding factor for the entire project. There are many
complications in the cross-border fast train link.

While we continue to wait for a faster train service linking KL and Singapore, we can get a taste of speed at 300 km from watching Formula One cars on Singapore's streets one day.

PS: Interesting trivia in the ST report today: When Dr Mahathir and Mokhzani met F1 supremo Bernie Ecclestone in 1995, Mokhzani said his father offered to build a circuit to host the Malaysian leg. Mr Ecclestone stood up and offered his hand.

Saturday, March 24, 2007

Bullet Train, Part 2

Malaysia says it will soon talk to Singapore on a private sector plan to build a bullet train between Kuala Lumpur and Singapore on Wednesday, commissioning a study of the proposal, state news agency Bernama said on Wednesday.

According to reports, Malaysian property and utility firm YTL Corp Bhd has proposed to build and run an 8-billion-ringgit (US$2.2 billion) bullet train between KL and Singapore. No other details are available.

The YTL plan, which first surfaced last year, has generated the usual debate about the need for such a service, as evidenced by the responses to a news article posted on Malaysia Today.

There is definitely a need for a fast train service between the two capitals. Keretapi Tanah Melayu (KTM service as seen in this pix) can take more than eight hours to connect KL and Singapore. Driving takes half the time. Perhaps, the old KTM train service should be dedicated to ferrying non-perishable goods like fertiliser.

The two countries must see a faster train service -- that can cut travel time to between 90 minutes and 2 hours between the two capitals -- as beneficial to the PEOPLE of the two countries and not be sidetracked by smaller and technical issues or "balance of benefits".

Although a faster train project is necessary, there will be many complications as mentioned in an earlier posting.

Saturday, December 23, 2006

Updated: Malay Land Railway

The massive rains have caused havoc to southern and eastern Malaysia. The country is still cleaning up the mess.

As widely reported, the rail service from Singapore to certain parts of Malaysia has been disrupted due to the floods. The service disruption is aptly captured in this rather interesting picture in New Straits Times. Several observations can be made about the disruption of the train service in Malaysia:

1. First, the current single track system operated by the anachronistically named Keretapi Tanah Melayu (Malay Land Railway or Malayan Railway instead of Malaysian Railway) is obviously inadequate. Malaysia needs a double-tracking system to allow two-way traffic. The second line can still be used in the event of disruption to the first line. How can Malaysia move goods and people fast using a rail network that was built by the British in the late 19th century?

2. It's perhaps better to embark on a fast train service project in Malaysia that will require a stronger foundation for the tracks. Such tracks won't be as easily dislodged as the old gravel system to support the single track.

MMC and Gamuda had proposed a double-tracking railway system for a fast train service but the RM14.5-billion project was shelved by Prime Minister Abdullah Ahmad Badawi three years ago. Malaysian tycoon Francis Yeoh of YTL is now proposing a bullet train service between KL and Singapore but it's not known if the train service will materialise as well.

3. The disruption of the rail service has raised an interesting academic conundrum for bilateral ties between Malaysia and Singapore.

It is well known that Malaysia has legal title to the railway land in Singapore to operate a railway service through KTM. However, under the terms of the lease, should Malaysia stop operating its railway service to Singapore, the Malaysian railway land in Singapore reverts to Singapore (That is why KTM had been runing the shabby train service to Singapore although it was probably losing money from carrying so few passengers on each trip!)

The point is probably moot because Malaysia and Singapore had signed the so-called Points of Agreement to jointly re-develop the Malaysian railway land in Singapore in 1990. However, the two governments have not been able to come to terms on basic points in the POA in the past 16 years.

In fact, Malaysia's former PM Dr Mahathir Mohamad didn't quite recognise the POA, saying it was not ratified by the Malaysian Parliament -- eight years after it was signed by former Singapore PM Lee Kuan Yew and ex-Malaysian Finance Minister Daim Zainuddin.

So what will happen to the Malaysian railway land in Singapore if Malaysia uses the damage caused by the flood as an excuse to stop its unpopular* train service to Singapore indefinitely?

*The train service is not the most popular mode of transport between Singapore and KL as it takes more than seven hours on the current single track. Furthermore, it's faster to travel by highway (4 hours) and planes (45 minutes). The KTM service will become even more anachronistic once the Asean open-skies pact takes effect in 2008, a move that will allow budget airlines to fly more freely between KL and Singapore and other Asean cities.

Latest: KTM has resumed train service since Christmas Eve, according to Singapore TV channel Channel NewsAsia. But KTM is still a shabby service!